Objective:
Applying the principles of the successfully completed Design for Production this project will focus on the reduction of total ownership costs.
Summary:
Utilizing similar techniques and tools as those successfully applied during the Design for Production project, this project will: provide comprehensive design solutions aimed at the reduction of Operations and Support costs of ships and ship systems; establish hull, mechanical and electrical ship repair standards to increase reliability of ship maintenance and modernization activities; deploy a comprehensive implementation strategy across the shipbuilding and repair industry through direct participation by the Navy, Coast Guard, and industry; and develop and disseminate technology transfer activities to the industry at large, as well as the design standards community.
Request Final Report from NSRP – Limited Distribution authorized to U.S. shipyards and NSRP ASE Program representatives
Overview

Project Team:
- Bollinger Shipyards
 - BAE Systems Southeast Shipyards
 - Vigor Industrial
 - General Dynamics Electric Boat
 - Trident Refit Facility Kings Bay
 - Naval Surface Warfare Center - Carderock (NSWCC)
 - Matt Tedesco
 - Hepinstall Consulting Group
 - Victoria Dlugokecki
 
June 2011 - July 2013
NSRP ASE Investment: $1.0M
Industry Investment: $840K