Objective:

The goal of the project is to reduce the cost and time associated with welding single-sided joints onboard vessels during ship erection, and to reduce plate preparation and post-weld straightening costs by using single-pass square groove Buried Arc Gas metal Arc Welding (GMAW-B).

The objectives of the project are:

  1. Develop portable mechanized GMAW-B methods for the candidate application
  2. Demonstrate that the developed GMAW-B methods can meet identified ABS/NAVSEA procedure qualification test requirements
  3. Support implementation at a participating shipyard

To request a copy of the Final Report please email nsrp@ati.org

Overview

Welding Technology

Project Team:

  • EWI
  • Vigor
  • HII-Newport News Shipbuilding
  • NSWCCD
  • OTC-DAIHENProject Observers:Austal USA

    VT Halter Marine

2021