Objective:

The purpose of this project was to understand the requirements for designing / building equipment “Interface Adapters” (foundations) on various Navy platforms fitted with Flexible Infrastructure (FI).  Experience with prior projects and with the FI Support Systems technology indicated that there is a unique opportunity for standardization of foundations across platforms. Thus, this project studied the impact of “one-size-fits-all” Interface Adapters (IA) for the same equipment used on the various Navy platforms. It identified and documented the steps for designing and building IAs with a focus on reducing cost and weight and optimizing reusability. Finally, case studies were presented on specific equipment to validate the research.

Request Final Report from NSRPLimited Distribution to authorized government agencies and NSRP ASE Program representatives

Overview

Ship Warfare Systems Integration Panel Icon
Ship Warfare Systems Integration

Project Team:

  • Newport News Shipbuilding
  • Ingalls Shipbuilding

2015

NSRP ASE Investment: $148K