Overview
Flexible Infrastructure Bulkhead Track Improvements (2017-415)
Project Team:
- Ingalls Shipbuilding
- National Technical Systems
- Hilti North America
NSRP ASE Investment: $150K
Objective:
The goal of this project was to test methods with proposed improvements to the previous NSRP RA Project (Flexible Infrastructure Qualification), so that the flexible infrastructure support system provides the Navy with a complete package of track systems and attachments that have been tested for all relevant shock and vibration criteria.
Key Deliverables:
Request Final Report from NSRP – Limited Distribution authorized only to U.S. Commercial and Government Shipyards