Objective:

The goals of this project were to include summarizing the current uses of Be-containing products in current US shipyard work; Collect and review existing representative occupational exposure data for comparable work with Be-containing products to characterize potential exposures and define effective control measures for work above and below regulatory thresholds; Evaluate abrasive blasting process efficiency for control of potential Be exposure during surface preparation and coatings work; Determine where additional air monitoring is needed for production work other than abrasive blasting to fill in knowledge gaps in shipyard work with potential exposure to Beryllium.

Request Final Report from NSRP – Approved for Public Release

Overview

Workforce & Compliance

 

Project Team:

  • BSI EHS Services and Solutions
  • US Navy NAVSEA
  • NAVMEDCEN Industrial Hygiene
  • GD Bath Iron Works
  • HII-Newport News Shipbuilding
  • Norfolk Naval Shipyard

2018

NSRP ASE Investment: $150K