Overview
Requirements for a Shipbuilding Drawingless Environment (2014-432)
Project Team:
- Newport News Shipbuilding
- Ingalls Shipbuilding
- General Dynamics Electric Boat
- Siemens PLM
2014
NSRP ASE Investment: $148K
Objective:
This project sought to document those requirements necessary to move shipbuilding technology from a Product Centric (2D hard copy drawing) to a Data Centric (3D product model, drawingless) environment. The product model will be used for ship arrangement configuration management and product deliverable executing. These deliverables will be used to replace drawings with geometry and data for arrangements (Engineering) and manufacturing work packages (Planning and Construction).
Key Deliverables:
Request Final Report from NSRP – Limited Distribution authorized to U.S. shipyards and NSRP ASE Program representatives