NSRP
  • Organization
  • About
    • About
    • History
    • Ad Hoc Initiatives
  • R&D Projects
    • Solicitations
    • Project Selection & Execution
    • Portfolio
    • Recent Awards
    • Teaming
  • Panels & Events
    • Calendar of Events
    • Panels
    • Meetings & Events
    • Past Events & Presentations
    • Technology Transfer
  • Resources
    • News & Information
    • Solicitation Resources
    • Project Team Presentation Materials
    • Project Plans and Templates
  • Contact Us
    • Executive Control Board
    • Major Initiatives Teams
    • Navy Program Office
    • NSRP Shipyard Delegates
    • Panel Chairs
    • Program Staff
    • Technical Points of Contact

2012

2012-443
2012

Virtual Reality Wiring Training

2012-463
2012

Development of Cable Test Management System (CTMS) Application

2012-459
2012

Leverage Detail Design Data in Weight Engineering

2012-467
2012

Cost Reduction Measures for Late Stage Outfitting

2012-465
2012

First-Order Design Tool for Beam-Stiffened Plate Structures

2013-401
2012

Prototype Implementation of a Visualization System for 3D Models of CPC Parts

2012-461
2012

Benefit Assessment of High Productivity Ultrasonic Assisted Drilling for Shipbuilding

2012-462
2012

Evaluation of Model Based Engineering (MBE) and Advanced Forming Technology for Complex Hull Manufacturing

2005-333-R15
2012

Validation of Analysis Methods for Padeyes through Destructive Testing

2012-435
2012, 2013

Ship Cable Management

2011-458
2011, 2012, 2013

Design for Maintenance & Repair

2011-459
2011, 2012, 2013, 2014

Swaged Bulkhead Analysis Verification

2011-461
2011, 2012, 2013, 2014
NSRP project Naval Vessel Ice Capability Effort

Naval Vessel Ice Capability Optimization Effort

2011-460
2011, 2012, 2013
NSRP project Friction Stir Welding

First Time Quality, NDE, and Fitness for Service Technology for Friction Stir Welding and Manufacturing Aluminum Panels for Ships

2010-621
2010, 2011, 2012

Common Parts Catalog Enhancements

2012-469
2012

Fiber-Optics Manufacturing and Installation

2012-468
2012

Rapidly Deployable General Lighting Hardware Development

2005-341-R29
2012

Tip Tig vs. Tig

2005-333-016
2012

Foreign Shipyard Coating Benchmarking Study

2012-466
2012

Surface Preparation in the Shipyard with Closed Loop Ablation

2012-456
2012

Ventilation for Painting in Enclosed Spaces

2012-453
2012, 2013, 2014

Evaluation of Copper-Free Anti-Fouling Coating

2012-433
2012, 2013

Mobile Robotic Manufacturing System

2012-431
2011, 2012, 2013

Distortion Control “Tool Box” for Lightweight Ship Structures

2011-462
2011, 2012, 2013

21st Century Smart Weld Inspection Tool

2011-463
2011, 2012, 2013

Elimination of Overwelding

2010-626
2010, 2011, 2012

Weld Shrinkage and Distortion Allowance Data Model for Neat Construction Ship Design Engineering

2010-620
2010, 2011, 2012

Streamlining Shipyard Rigging Analysis

2010-622
2010, 2011, 2012

Advanced Systems Development of the Remote Climbing Robot

2008-396
2008, 2009, 2010, 2011, 2012

Manufacturing and Assembly Technology for Low-Cost Pultruded Composites

2012-432
2012, 2013

Production Planning Integration with CAD

2012-434
2012, 2013

Product Model Driven Weld Management (PMDWM)

2010-627
2010, 2011, 2012

Integrated Logistics Environment (ILE)

2010-625
2010, 2011, 2012

Enterprise Resource Planning (ERP) Integration with CAD

2008-601
2008, 2009, 2010, 2011, 2012, 2013

Improved Methods for Generation of Full-Ship Simulation/Analysis Models II

   NSRP is co-funded by the U.S. Shipbuilding Industry and U.S. Navy

© 2019 NSRP. All Rights Reserved.

Privacy Policy