SEARCH
Clear Space no Info Clear Space no Info

SSRAC proposals

  1. Dewpoint Spreadpoint Alternate
  2. Do Not Require 50% RH for ShopWork
  3. Small Tank Exemption
  4. Modify 85% RH Service Life
  5. Modify Cure Requiring 50% RH
  6. Relax Paint Storage Requirement
  7. Touch-up Exemption
  8. Data Logger Frequency 3.10.1.5
  9. Add Dirty Drain Collecting Tanks to Tables
  10. Allow PCP Rentention
  11. Clarify Number of Readings for Checkpoints
  12. Eliminate CAP Sheet Requirement
  13. Flash Rust (Table 1, Line 1 & Table 2, Line 1)
  14. Make wording consistent between 3.6.7 and 3.7.1.8
  15. New Item for FOS and Storage Tank Requirements
  16. Relax Paint Storage Requirement
  17. Data Logger Requirements (3.10.1.5)
  18. Data Logger Requirements (3.10.1.2)
  19. Conductivity Choloride Testing
  20. Dry Film Thickness (DFT) on Striped Film Area (3.10.11)
  21. Dry Film Thickness (DFT) On Striped Film Area (3.10.10.1)
  22. Conductivity or Cholride Measurement (Proposal)
    Conductivity or Cholride Measurement
    (Supporting Document #1)
    Conductivity or Cholride Measurement (Supporting Document #2)
  23. Sump Addition
  24. Powder Coating Checkpoints
  25. Profile Tape Quantity
  26. Coating in Storage
  27. Cap Sheet Submittal